(ASC X12) 964 Cost Code
TYPE=ID MIN=3 MAX=3
Code identifying cost element
Codes
FNC | Final Net Acquisition Cost |
HAN | Prototype Handling Cost |
LAB | Labor Cost |
MTL | Material Cost |
OCT | Sender’s Cost |
OTH | Other Cost |
OVR | Overhead Cost |
PKG | Packaging Cost |
RMP | Raw Material per Part Cost |
RMU | Raw Material per Unit of Measure Cost |
SET | Prototype Set-Up Cost |
TDI | Total Die Model Cost |
TGA | Total Gage Cost |
TLN | Line Item Tooling Cost |
TML | Total Material Cost |
TMP | Total Material Including Purchased Components Cost |
TOL | Total Other Tooling Cost |
TPU | Total Purchased Components Cost |
TTL | Total Tooling Cost |
Appears in
CST | Cost Analysis |
Categories: